How to Start a Bullet Journal: A Beginner's Guide
Source: Bullet Journal • Full tutorial: www.craftingstepbystep.com/scrapbooking/how-to-start-bullet-journaling
- Difficulty
- Easy
- Hands-on time
- About 45 minutes
- Makes
- a set up bullet journal with index and first month

Tools
- Dotted notebook (Leuchtturm 1917 A5 or similar)
- Fineliner pens (Sakura Pigma Micron set, multiple widths)
- Ruler
Materials
- Washi tape (optional, for tabs and decoration)
- Sticker pack (optional)
Steps
1. Title the Index
Open your notebook to the first blank spread. Title both pages as Index.
Tip: Reserve the first 2 to 4 pages for the Index even if you only title the first spread today. Indexes fill up faster than you think once you start adding collections.

2. Set Up the Future Log
Turn to the next blank spread. Title both pages as Future Log.
Tip: Don't overthink the layout. The Future Log is a holding pen for dates and intentions, not a calendar you decorate. Plain boxes with month names work as well as anything fancier.

3. Number the Pages and Log to the Index
Go back and add page numbers to every page you've used so far (most dotted notebooks already have them, but if yours doesn't, write them in the bottom corners). Now flip back to the Index and add an entry for the Future Log with its page numbers.
Tip: This habit of indexing as you go is the hidden engine of the system. Skip it for a week and the journal stops being findable.

4. Build the Monthly Log Calendar
Turn to your next blank spread. Write the name of the current month at the top of both pages.
Tip: Use the calendar side for things that already have a date attached: appointments, deadlines, birthdays, travel. Don't fill it with tasks. Tasks go on the right page.

5. Write the Monthly Task List
The right page of the Monthly Log spread is your task list for the month. Write down everything you need to get done in the next 30-ish days.
Tip: Don't try to schedule the tasks yet. The monthly task list is a brain dump. Scheduling happens day by day in the Daily Log.

6. Rapid Log Daily Entries
On the next blank page, write today's date at the top. This is your Daily Log.
Tip: Don't pre-rule the page or count lines. Just date the top and start logging. If a day fills the page, start the next day on the next page.

7. Migrate Open Tasks Each Month
At the end of each month, set up your next Monthly Log on a fresh spread. Then scan back through the month's daily logs.
Tip: Migration is the difference between a bullet journal and a to-do list that just keeps growing. Don't skip it - it's where the system earns its keep.
